When it comes to the installation of imitation wood guardrails, it seems very simple, but if you don't pay attention, the imitation wood guardrails will appear high and low, affecting their appearance and being unstable. So how to install imitation wood guardrails? Shandong imitation wood guardrail manufacturer analyzes for you:
一、立柱的預(yù)埋孔位:先由工程施工方將地面基礎(chǔ)按尺寸標(biāo)注做好預(yù)埋孔,預(yù)留好分隔柱的安裝孔
1、 Location of embedded holes for columns: The engineering construction party shall first mark the ground foundation with embedded holes according to dimensions, and reserve the installation holes for the separation columns
土質(zhì)地基挖孔深度30公分,水泥地基挖孔深度20公分,測量中心距,依次做預(yù)埋孔
The depth of hole excavation for soil foundation is 30cm, and the depth of hole excavation for cement foundation is 20cm. Measure the center distance, and make embedded holes in turn
二、立柱安裝:當(dāng)?shù)卣埰胀ㄐ」?,先放好水平線,確認(rèn)水平線是否垂直,再將立柱放入洞口固定,在預(yù)留的安裝孔上安裝分隔柱,安裝時注意分隔柱的垂直度,并用水泥砂漿灌漿結(jié)實(shí)。
2、 Column installation: Local ordinary workers are invited to set out the horizontal line first, confirm whether the horizontal line is vertical, and then place the column in the hole for fixation. Install the separation column on the reserved installation hole. During installation, pay attention to the verticality of the separation column, and grout it firmly with cement mortar.
1、土質(zhì)地基灌混凝土10公分厚,水泥地基不需要灌;
1. The soil foundation is filled with concrete with a thickness of 10 centimeters, and the cement foundation does not need to be filled;
2、安裝起步柱;
2. Install the starting post;
3、安裝校正柱;
3. Install the correction column;
4、放線校正垂直度和平行度;
4. Setting out to correct perpendicularity and parallelism;
5、安裝第二個立柱;
5. Install the second column;
三、欄桿安裝:兩邊立柱固定好后,再將欄桿的造型欄板嵌入到立柱的預(yù)留洞口內(nèi)組裝固定,欄板一般可預(yù)埋3-5cm;
3、 Railing installation: After the columns on both sides are fixed, insert the modeling fence board of the railing into the reserved hole of the column for assembly and fixation. The fence board can generally be embedded for 3-5 cm;
安裝橫梁,安裝時注意整體水平度。
Install the cross beam and pay attention to the overall levelness during installation.
四、將所有立柱和欄板、橫梁全部組裝好后,用水泥砂漿將預(yù)留的洞口填平固定;
4、 After assembling all columns, breast boards, and beams, fill and fix the reserved openings with cement mortar;
1、重復(fù)第三步,依次類推安裝;
1. Repeat the third step and install it in sequence;
2、用水泥和801膠水混合補(bǔ)縫;
2. Mix cement and 801 glue to fill the joint;
五、全部固定好后,需做清潔清理工作,若安裝時,砂漿等濺到產(chǎn)品表面上,應(yīng)及時以水刷拭干凈,以防粘附在產(chǎn)品表面,影響產(chǎn)品表面美觀?,F(xiàn)場噴涂戶外油漆即可呈現(xiàn)很好效果。安裝完畢及時清理安裝現(xiàn)場。
5、 After all are fixed, it is necessary to perform cleaning work. If mortar or the like splashes onto the product surface during installation, it should be promptly wiped with water to prevent adhesion to the product surface and affecting the appearance of the product surface. Spraying outdoor paint on site can achieve good results. Clean the installation site timely after installation.
安裝前需要對運(yùn)到工地的仿木護(hù)欄立柱、分隔柱、欄桿、橫梁等構(gòu)件進(jìn)行一一檢查,檢查構(gòu)件在運(yùn)輸、堆放過程中是否變形,檢查尺寸是否符合要求。更多相關(guān)事項(xiàng)就來我們網(wǎng)站
http://gxwgw.cn咨詢!
Before installation, it is necessary to inspect the wooden guardrail columns, partition columns, railings, beams, and other components transported to the construction site one by one, to check whether the components are deformed during transportation and stacking, and to check whether the dimensions meet the requirements. For more related matters, please visit our website http://gxwgw.cn consulting service